Page 15 - JaKita 10th Edition 2021
P. 15

15 15
                                                                                  TOP REPORT             15






          According to the President Director of PT MITJ     has been good enough. However, the passenger
          Tuhiyat, there are three phases of activities in the   transport rate (ridership) is still considered low.
          tickets and fares integration. The three phases    The Jakarta government has made changes
          are called the central clearing house system.      to its transportation development policy, from
          In the first phase, PT JakLingko has innovated     Private Vehicle Oriented to be Transit Oriented
          JakLingko card and application. Both have          Development (TOD).
          been tested on a limited trials in August 2021 on
          Commuter Train, MRT Jakarta, Transjakarta and      Previously, Jakarta government had given a
          LRT Jakarta. “The launch of the JakLingko card     mandate to PT MRT Jakarta to develop the
          and  application  marks  the  completion  of  the   concept   of   transit-oriented  development
          first phase,” said Tuhiyat.                        (transit-oriented area/TOD) and becomes
                                                             the main operator of TOD area management
          In the second phase, JakLingko will complete       at  eight  MRT  stations,  including  Lebak  Bulus
          the Mobility as a Service (MAAS) project. The      station, Blok M station, Senayan station, Istora
          target is set to finish in March 2022. While the   station, Bendungan Hilir station, Setiabudi
          third phase, JakLingko is currently working on     station, Dukuh Atas station, and Bundaran Hotel
          Account Based Ticketing which is targeted          Indonesia station.
          for completion in August 2022. “After all of
          this is complete, the connectivity of ticketing    Lebak Bulus station is the first station in the South-
          payments for transportation modes in Jakarta       North corridor which is expected to attract people
          can be easier because they are integrated with     from the buffer area who have many activities in
          each other,” said Tuhiyat.                         Jakarta. Integration in the TOD concept combines
                                                             the function of transit in people, activities,
          Furthermore, for the second project: the           buildings, and public spaces. The goal is to
          construction of the Dukuh Atas Multipurpose        optimize access to public transportation so that
          Crossing Bridge (JPM) and the revitalization of    it can support passenger transport rate.
          Sudirman  Station. The  JPM named  “Serambi
          Temu Dukuh Atas” is targeted to complete in        President  Director  of  PT  MRT  Jakarta  William
          the same time with the planned operation of        Sabandar said this concept provides a number
          the Jabodebek LRT in June 2022. Tuhiyat hopes      of benefits for the people. That includes reducing
          that JPM Serambi Temu Dukuh Atas will become       vehicle use, road congestion and air pollution.
          an icon of integration, a new urban identity and   Another added value of TOD is an increase in
          an inclusive public space.                         the economy by opening up access to job
                                                             opportunities. “What is certain is that there is an
          Previously, said Tuhiyat, PT MITJ had also         increase in the number of transit passengers
          conducted a thorough study to develop the          with a choice of various transportation modes,”
          integration concept. As a result, optimizing       he explained.
          integration in Jabodetabek requires at least
          six integration dimensions, namely physical        William is grateful for the services integration
          integration, management integration, service       and the TOD concept which gave a good impact
          integration, ticketing integration, information    on passenger ridership by 237% in the period
          provision integration and brand integration.       of August-September 2021. In August 2021, MRT
                                                             Jakarta passengers reached 185,647 people.
          Transit-Based City                                 Meanwhile, in September 2021, MRT passengers
                                                             reached 383,835 people.
          In fact, Jakarta’s transportation infrastructure                                         sya/bam







                                                                                                       10th EDITION 2021
                                                                                       Sarana Informasi Pemerintah Provinsi DKI Jakarta
   10   11   12   13   14   15   16   17   18   19   20