Page 13 - Mediajaya 08 Edition 2020
P. 13

MEDIA JAYA | 08 2020







            of the priorities?               velopment of this kampung will be ex-  bernatorial Regulation No.112/2019
                                             actly like the residents wanted it to be.   on Funding and Building Guideline for
            Kampung Akuarium was one of the   The most important thing is we tried   Affordable/Simple Flats through Con-
            kampungs stipulated to be in the pri-  to enhance the quality of settlements   version of Space Use Permit Holders.
            ority by the Statistics Indonesia (BPS),   by  doing  an  integrated,  synergistic,   The developer is PT Almaron Perkasa.
            as we have considered that the resi-  collaborative and sustainable resto-
            dents as well as the administration   ration.                     How much budget is prepared for the
            are ready (for restoration).                                      kampung restoration?
                                             How is the residents involvement in
            How do the implementation?       this development?                For the restoration in Kampung
                                                                              Akuarium alone we will provide 62 bil-
            We surely will do it gradually, as it is   The residents  will be involved since   lions of rupiahs.
            our joint work in agrarian reform task   the beginning of the development,
            force. Besides, we will handle the ar-  means they are invited since the plan-  How about the other 21 kampungs,
            rangement for land’s asset and legal-  ning stage. We engage them in discus-  has the budget already been pre-
            ity.                             sions, to find out what we’re going to   pared, too?
                                             do together.
            What is the main focus for this kam-                              Not yet. The budget will be ready by
            pung restoration program?        Besides  the  development  for  the   the time the location is set and suit-
                                             kampung, what else is being devel-  able  for  its  legal  and  allocation  as-
            Actually, we focus on providing ade-  oped?                       pects. Only then we will coordinate
            quate and safe housings for the kam-                              with the city’s Development and Envi-
            pung residents. So, we’re not only de-  Besides revamping the environment,   ronment Bureau and prepare the bud-
            veloping the physical building but also   we also try to enhance the quality of   get.
            the quality of the people, of its social,   its people. Stated in Pergub, there are
            culture and economic aspects.    three priority points that need to be   Besides Kampung Akuarium, where   13
                                             restored.  First, the  physical  restora-  else the restoration will take place?
            What kind of approach did you use in   tion. Second, the aspect of social and
            this slums restoration program?  culture and the third, the economy.  One of other kampungs to be restored
                                                                              is Kampung Bukit Duri. We’re still dis-
            The program is conducted through   What is the role of Jakarta Housing   cussing and studying the plan. I hope
            Community Action Plan (CAP) ap-  and Settlement Agency (PRKP)?    it’ll be done soon, and the local resi-
            proach, which will be implemented for                             dents agreed to it, too, so we can start
            all of the priority kampungs. But from   We will perform the CAP approach,   at the end of the year. We look for the
            these 21 kampungs, some locations   including the scope for arranging the   area which has in side area (area re-
            are stated in the Gubernatorial Regu-  physical infrastructure and environ-  mained good as before the eviction).
            lation No.90/2018 on Slums Restora-  ment.  While  for  the  culture  and  so-  So if it doesn’t suit that, we have to
            tion for Integrated Settlements Area,   cial aspects will be performed by des-  look for another suitable areas. We fo-
            means they’re being converged as   ignated working units (SKPD). We will   cus on the area (asset) owned by the
            they are also stipulated in the Guber-  provide input on what needs to be   Jakarta administration.
            natorial Decree No.878/2018 on Kam-  done, which will be seen through the
            pung Restoration Task Force.     CAP immediately.                 What is your hope with this Enhanc-
                                                                              ing The Quality of Settlements pro-
            How is the development concept?  What will the restoration be like?  gram?

            As for the concept of slums/kampung   The restoration will be conducted on a   I hope that the residents will be pro-
            development, we will invite a col-  10,000 square meter land. There will   vided with adequate housings, which
            laboration  and  involvement  from  the   be 241 housings in type 36 house plan   will be built through an integrated,
            citizens especially for the planning   for the local residents. The process   synergistic, collaborative and sustain-
            process, to plan and formulate the   will be done under the obligation of   able work.
            residents’ needs. By doing so, the de-  the developer,  as stipulated in the Gu-                       gro
   8   9   10   11   12   13   14   15   16   17   18