Page 17 - Mediajaya 08 Edition 2020
P. 17

MEDIA JAYA | 08 2020





            White Elephants conducted settle-  Criteria of Slum Housing and Settlement according
            ment restoration program for those   to PP 14/2016 vese 108
            who have been evicted and moved
            to the state-owned empty lands, like
            what they’ve done in Phasi Charoen,   Tower Buildings                Waste Management
                                                                                 Inadequate quality of infrastructure and
                                              Disorganized
            one of the 50 districts in Bangkok.  High density                    management system for waste disposal
               In a program called Baan       Inadequate quality of building     Bad quality
            Mankong (means safe house), the
            government aimed to enhance the   Streets                            Sewage Treatment System
            quality of the settlement and protect   Street doesnt cover all of housing and   Inadequate quality of infrastructure and
            the rights for housing for residents   settlement area               management system for sewage
            with low-income. The program start-  Bad quality of street surfaces  Drinking Water Supply System
            ed in 2003, with a target to create a                                No access for drinking water supply
            city without slums throughout Thai-                                  No supply for individual needs
            land.                             Environmental Drainage             Fire Protection System
               The government of Thailand     Not provided                       No facilities or infrastructure for fire
            made a community based approach   Unable to flow rainwater           protection system
            to solve the slums problem, which   Bad quality
            was caused by the increasing of pop-
            ulation density from urbanization.
            With this approach, they let the poors
            who live in the city to choose their
            needs for housing and settlements.
               The restoration was made by
            Community Development Fund (CDF)
            method: they would do the saving in
            groups and would be granted some                                                                       17
            loans to build their homes in a new
            land. Each family were granted a
            period of tenor. After returning the
            loan, the house certificate would be
            handed to them and they are free to
            modify the house afterwards.                                                         Infographic/Tommy.K.R
               The program involved the role of
            the government, the communities                         Marta, Rio de Jeneiro. The local government creat-
            and non-governmental organizations                      ed a collaboration with the residents and donor in-
            (NGO). The government, who acts as                      stitution (World Bank), in order to facilitate housing
            regulator,  founded  the  Urban  Com-                   infrastructures, such as: streets, drainages, clean
            munity Development Office (UCDO)   There are one        water and sewage treatment system for 17,200
            in 1992, then joined the Rural De-  billion of people   families in that 1,300 Ha area.
            velopment Fund to form Communi-   globally who live        In the neighboring country Brunei Darusalam,
            ty Organizations Development Insti-  in informal slum   the government made a slum upgrade in an area
            tute (CODI) in 2000. Meanwhile, they   areas            which known today as Kampong Ayer, in the capi-
            also invited the communities to take                    tal city Bandar Sri Begawan. Before it’s been re-
            parts in the community-based resto-  Pretoria           vamped to be a tourist destination, the area of Kam-
            ration. Architects and planners were   Declaration      pong Ayer was a slum typologically located above
            engaged to work with the residents,                     the water. The masterplan for this area was done
            and to communicate and facilitate                       2011, with the government and NGOs engaged  in
            them, too.                                              the whole process. The program goal was to revive
               Besides Thailand, Brazil had                         the Kampong, which was previously known as Ven-
            also succeeded in creating a break-                     ice of east. Today, the Kampong Ayer is known as
            through collaboration to overcome                       the largest floating village in the world.
            the slums problem in Favela Santa                                                      nis/ other sources
   12   13   14   15   16   17   18   19   20   21   22