Page 8 - EDITION 6 2020
P. 8

According to the data of JICA’s SI-
            TRAMP (Study on Integrated Trans-
            portation Master Plan), Jakarta has
      TOP REPORT  indeed high rate of mobility needs:
            21.9 millions of mobility with a total of
            15.3 millions motor vehicles per day.
            With an integrated mass transporta-
            tion, Djoko continued, public will eas-
            ily move from their private vehicles to
            public transportations. “Without it, we
            cant expect a city with efficient trans-
            portation system for their people or
            even dream that they will shift into us-
            ing public transportation,” he added.
               According to Djoko, it’s still been a
            big job for the government to encour-
            age the use of public transportation in
            Jakarta.  In the Jabodetabek’s Trans-
            portation Master Plan, it targets an
            escalation of 40% in 2019, 50% in 2024
            and 60% in 2029. Unfortunately, the
            situation shows otherwise, accord-
            ing to the Visual Frequency and Oc-
            cupancy survey conducted by Institute
            for Transportation and Development
            Policy (ITDP) Indonesia in 2014 and
    8       2018. The survey observes the volume
            of public transportation in Jakarta and
            shows a reduction of public transport
            users by 30%.
               To make it worse, a survey con-
            ducted by ITDP Indonesia also shown
            that  a  significant  58%  of  the  online
            ojek users are public transport us-
            ers. “From this data we can see that
            the users of public transportation tend
            to use online ojek as preferable trans-  for all types of transportation servic-  development. Every  types of transpor-
            portation modes, which significantly   es. “Currently there are schedule and   tation modes has the same challenge;
            impacted on the reduction of public   physical integrations while the inte-  they need to be connected,” said Anies
            transportation use in Jakarta,” Djoko   gration in payment method is under-  on the importance of integrated inter-
            explained.                        way.” said Djoko.               modal transportation in Jakarta.
               He said that there are at least                                   Currently, Jakarta Provincial Gov-
            three kinds of integration which needs   The Pillars of Transportation  ernment  (Pemprov  DKI)  has  created
            to be done: the physical, schedule and                            JakLingko, an integrated public trans-
            payment. Physical integration would   The  Governor  of  Jakarta  Anies   portation system based on roads and
            help people to move between modes   Baswedan declared that the Provin-  railways (microbus, Transjakarta, LRT
            easily. Schedule integration would   cial Government of Jakarta has tak-  and MRT). Transjakarta, one of Ja-
            be the suitability and well-informed   en a serious improvement on inte-  karta’s transportation pillars has also
            schedule upon the time of arrival and   grated  intermodal transportation  in   conducted an integration program by
            departure, including to cut the time   Jakarta, by keeping an integration   opening new, integrated routes. Pre-
            of waiting for people when transiting   development in Jakarta’s transporta-  viously,  there are  109  routes  in  2017
            between modes. And lastly, the pay-  tion pillars such as Transjakarta, MRT,   and became 247 routes in 2019. The
            ment integration would be the pay-  LRT and KRL. “Integrated intermodal   units are also added, from 2,380 units
            ment  method  using  smartcard that   transportation is the key to solve the   in 2017 to 3,888 units in 2019.
            enables people to use only one card   challenges in Jakarta’s infrastructure   According to him, so far the work
   3   4   5   6   7   8   9   10   11   12   13