Page 10 - EDITION 6 2020
P. 10

TOP REPORT               The New Look of

                               Integrated Stations










                    The integration in public     ince being set as a Transit Ori-  four stations which previously seemed
               transportations is not only for    ented Development (TOD) area,   so dirty are now clean, safe and conve-
                the physical, service or route   STanah Abang Station in Cen-  nient for people. “Three months ago,
             aspects but also for the payment   tral Jakarta emerges with new look.   the  place where  we  stand  right  now
                                   method.   Some public facilities are added to   was a dirty, unsafe and unhealthy en-
                                             the area: information boards, signag-
                                                                              vironment. Alhamdulillah, it is now
                                             es and internal standard-street signs.   become a convenient place for public,”
                                             With these new supports, it is hoped   he said in his opening speech.
                  The Concept of Four        to help newcomers to be able to follow   The next phase of integrated sta-
                   Integrated Stations       directions to the integrated transports   tion development  will occur in an-
                                             around the station. There is also a lay   other five designated stations, name-
                                             bay area—an area to wait for the arriv-  ly Manggarai Station, Tebet Station,
                                             al of public transport modes like mi-  Gondangdia Station, Palmerah Station
                                             krolets or Transjakarta buses. It will   and Jakarta Kota Station. “The devel-
    10                                       also prevent bajaj and mikrolet to drop   opment in Jakarta Kota area will be
                                             off or pick up passengers randomly.   conducted along with the revamp of
                                             The station also provides an area to   Kota Tua area and the development of
                                             drop off online ojek users.      MRT phase II,” he explained.
                                                Some time ago, the Governor of   He continued that the integration
                                             Jakarta Anies Baswedan, along with   concept was to connect all of the mass
                                             the Ministry of State-Owned Enter-  transportation network in Jakarta like
                                             prises (BUMN) Erick Thohir and the   buses, trains, taxis, bajaj or angkot
                                             Ministry of Transportation Budi Karya   (public minivans). Hence, people of
                                             Sumadi visited the station. They came   Jabodetabek will be able to use public
            1. Tanah Abang Station
                                             to  inaugurate  four  integrated  sta-  transports from one location to anoth-
            The integrated station of Tanah Abang was   tions and marked the finishing of the   er. “We knew that if public transporta-
            built in the 3,578 m2 land owned by PT   first phase of integrated station de-  tion are there without integration, our
            KAI. There are some facilities such as drop   velopment. The four stations are Ta-  people wont get to use them optimal-
            off and pick up area for ojek online, transit
            park area for ojek, lay by area for Bajaj,   nah Abang Station, Sudirman Station,   ly,” Anies said.
            pedestrian plaza, Transjakarta bus stop and   Juanda Station and Senen Station.  He showed gratitude and apprecia-
            transit supports.                   Anies was grateful that there will   tion for all of the parties involved in the
                                             be a developed city in Indonesia. The   development of this first phase of inte-
            2. Sudirman Station
                                                                              gration development, especially to the
            In the area of Sudirman Station, there are   an area. There are also area for ojek online   Ministry of State-Owned Enterprises
                                             and facilities to support people to move   Erick Thohir and Ministry of Transpor-
            revamping on the entry and exit hall which   between modes.
            directs passengers to the pedestrians area                        tation Budi Karya Sumadi, who helped
            easily, so they can move to another modes   4.  Juanda Station    accelerate the development through a
            like MRT, Airport Railink trains, Transja-                        joint venture of PT MRT and PT KAI, PT
            karta, or ojek online.           There will also be revamping for online and   Moda Integrasi Transportasi Jabode-
                                             conventional ojek area which previously
            3. Pasar Senen Station           been set in ruko (shop houses) towards   tabek (MITJ).
                                             the area of Istiqlal Mosque, to be placed in   President Director of PT KAI Di-
            For Pasar Senen Station, Indonesia Railway   an area under the overpass railway in the   diek Hartantyo revealed that the re-
            company PT KAI  changed the entry and   northern side of Juanda Station or towards
            exit passengers flow through the pedestri-  the Jakarta Kota area.  vamping of the station to be an inte-
                                                               Infografis/Tommy.K.R
   5   6   7   8   9   10   11   12   13   14   15